A novice's journey from vacant block to dream home with Metricon Brisbane. We wish to share this exciting project with friends and family along with others building a home. We hope by sharing the detail of our build process that this blog will inspire and support other first time, inexperienced, virgin home builders.
Wednesday, October 5, 2011
Photo Journal Part 3
Where Are The Photos?
My apologies for getting really behind with posting photographs, I was away at a workshop for a few days and had left the camera with the family so they could follow progress. There now follows an awful lot of pictures as I wasn't sure whether to add them to previous posts or just put them all in one big photo journal.
See photo journal Parts 1 -5
See photo journal Parts 1 -5
Tuesday, October 4, 2011
We Have The Power
Well its been a busy weekend, we have light switches, plug sockets, ceiling fans, air con vents, lights and all sorts of electrical stuff going on. The electrical crew were there Friday, Saturday and Monday so they must sense that the deadline to get this house finished is near.
The insulation bats have been put in the loft space and I'm not quite sure if anything else has happened at this point. We did get some colour samples for the robe door and have picked out a lovely metallic grey/brown for the master suite which should sparkle nicely under the lights.
The construction for the pool also has continued over a similar time frame. Apparently they ran out of steel for the form work so had to leave it until Monday. Hopefully the concrete will be poured today as scheduled . Not entirely sure of the weather forecast but it looks like showers which is actually good as it slows the set of the concrete giving a harder final result.
We are yet to have a site meeting with the SS to go over the issues that we have spotted. He was super grumpy when I spoke to him about it last week and was quite rude to me actually. I called him back later and told him that I didn't appreciate being spoken to like one of his tradies and reminded him that I am his customer paying his wages. I did get an apology so hopefully we can move forward now without any dramas.
I promise I will post some photos soon (watch this space so to speak)
The insulation bats have been put in the loft space and I'm not quite sure if anything else has happened at this point. We did get some colour samples for the robe door and have picked out a lovely metallic grey/brown for the master suite which should sparkle nicely under the lights.
The construction for the pool also has continued over a similar time frame. Apparently they ran out of steel for the form work so had to leave it until Monday. Hopefully the concrete will be poured today as scheduled . Not entirely sure of the weather forecast but it looks like showers which is actually good as it slows the set of the concrete giving a harder final result.
We are yet to have a site meeting with the SS to go over the issues that we have spotted. He was super grumpy when I spoke to him about it last week and was quite rude to me actually. I called him back later and told him that I didn't appreciate being spoken to like one of his tradies and reminded him that I am his customer paying his wages. I did get an apology so hopefully we can move forward now without any dramas.
I promise I will post some photos soon (watch this space so to speak)
Saturday, October 1, 2011
Steel and Electrics
The steel work is in for the pool and for the paving areas around it and in the outdoor room ready for concrete to be poured on Monday. I've had no more calls from either sets of builders so I have to assume they managed to sort out their differences. They have a few finishing touches so should be on site again today. Indoors they have started on the lights, switches and sockets. I will check on progress when I return later tomorrow.