Wednesday, October 5, 2011

Photo Journal Part 4

Power Points Et Al

Light Switches - Clipsal Slim

Down Lights

Outdoor Room Ceiling Fan and Lights

Family Room Celing Fan and Air Con Outlet

Photo Journal Part 3

Sill Tiled

Neat Job

Please can You Move This Pipe To The Right Our Pool Fencing Is Meant to Go Here
Pool Layout Commences


Dig Dig Dig Dig Digging A Hole

Its Getting Bigger

Pool Excavation

Pool Ready For Steels and Concrete
Outdoor Room Prep For Concrete

Outdoor Room Levelled

Photo Journal Part 2

Incorrect. This In-Fill Should Be White (Kitchen)

Water Point For Fridge

Security!!!!

TV, Home Network and Data Points

Alarm and Network Systems Control Panels

Door Handle

Toilet Roll Holder

Linen Cupboard With Handles

Kholer Shower and Tap
Family Bath - No Leaks!

Hmm Interesting Installation of My Bath

Towel Rail


What? This Wins The Prize For The Most Joins and Twists In A Waste Pipe

Robe Rails

Photo Journal Part 1

Powder Room Toilet


Powder Room Vanity With Sink and Tap


Shower


Family Bathroom Bath and Taps


Ensuite Shower and WC


Ensuite Sinks and Taps


Floor Tiles


Butler's Pantry Cavity Sliders With Door Handles


Butler's Pantry Extra Rows of Tiles, Sink and Tap


Laundry Door Close Up of Slider Handle


Water Tank Colorbond Dune

Clean Bricks

Close Up - The Bricks Have Scrubbed Up Nicely

Hot Water Heater


Outside Tap

Water Tank Plumbed

Laundry Sink

Where Are The Photos?

My apologies for getting really behind with posting photographs, I was away at a workshop for a few days and had left the camera with the family so they could follow progress. There now follows an awful lot of pictures as I wasn't sure whether to add them to previous posts or just put them all in one big photo journal.

See photo journal Parts 1 -5

Tuesday, October 4, 2011

We Have The Power

Well its been a busy weekend, we have light switches, plug sockets, ceiling fans, air con vents, lights and all sorts of electrical stuff going on. The electrical crew were there Friday, Saturday and Monday so they must sense that the deadline to get this house finished is near. 
The insulation bats have been put in the loft space and I'm not quite sure if anything else has happened at this point. We did get some colour samples for the robe door and have picked out a lovely metallic grey/brown for the master suite which should sparkle nicely under the lights.
The construction for the pool also has continued over a similar time frame. Apparently they ran out of steel for the form work so had to leave it until Monday. Hopefully the concrete will be poured today as scheduled . Not entirely sure of the weather forecast but it looks like showers which is actually good as it slows the set of the concrete giving a harder final result.

We are yet to have a site meeting with the SS to go over the issues that we have spotted. He was super grumpy when I spoke to him about it last week and was quite rude to me actually. I called him back later and told him that I didn't appreciate being spoken to like one of his tradies and reminded him that I am his customer paying his wages. I did get an apology so hopefully we can move forward now without any dramas.

I promise I will post some photos soon (watch this space so to speak)

Saturday, October 1, 2011

Steel and Electrics

The steel work is in for the pool and for the paving areas around it and in the outdoor room ready for concrete to be poured on Monday. I've had no more calls from either sets of builders so I have to assume they managed to sort out their differences. They have a few finishing touches so should be on site again today. Indoors they have started on the lights, switches and sockets. I will check on progress when I return later tomorrow.