Wednesday, August 24, 2011

Lots Of Activity

While we've been away it has rained a lot but the tradies have been busy on site doing lots of little things and completing tasks that were already underway. There were about 8 blokes working away at the house when we went in on Monday. So what progress did we see?

The kitchen installation continues
The cabinets have handles on
Doors have been hung (some not all)
We have door handles and locks on the exterior doors (our son wants his keys now!)
The floor prep has been done for the bathrooms
Laundry sink is in
Holes for lights, switches and other electrics have been made
Architraves are being cut and fit
The brick work is finished
A new kicker has been made for the ensuite vanity
Ensuite vanity has been moved (amusing photo to follow)

The tiling should start soon however the last we heard the tiles are not in the country yet so no guaranteed timeline can be given on that one.
Its looking good and really starting to come together as a house and not just a build now.
Front Door Handle

Rear Garage Door Hardware
Translucent Glass Door to Powder Room

Butler's Pantry Left Kitchen Right With Cavity Slider Middle (No Doors Yet)

Laundry Sink, Laminex Seal Bench Top

Island Bench With Space For Dishwasher

Close Up of Door Handles

Island Bench From Another Angle Note Silver Kicker

Bathroom Floor Prep

The Balcony

More of the Balcony

Cut Out For Light (This One Is Patch) In Wrong Place

Look They've Repositioned The Vanity!!!!!

Thursday, July 21, 2011

Sparkies and Spaghetti

Phew it's mad down on site can't turn your back for a second. The sparkies are back. There are electrical wires being run everywhere, it looks like we have a spaghetti house. Sandy managed to persuade the electrician to lower the power points in the garage even though he had already run and trimmed the wires, so this meant he had to re do them. Apparently they put them up high (1200mm) because they think you are going to have a work bench or hose the garage floor, at first he said he'd only lower them to 500mm so we could hose. Now I have had a garage for the last 10 years and have never had the urge to hose it once (we have also had water restrictions remember). Sandy explained she sweeps the floor and wants the sockets at standard 300mm - after all it is our house so in the end the electrician agreed. Good job!

The ducting and tubing for the air conditioning is also being installed at the same time so its all go at our place today.

The SS called to give me a progress report and introduce himself as we hadn't spoken with each other yet. After a little chat I mentioned about the the bi folds and he agreed they were installed backwards but indicated that no they would not be flush to the tiles like we had been told at our colour selections. I explained to him that is what we wanted, what we had paid for and how they appear in the display homes. He informed me that the ones in the display homes have several more coats of lacquer on to protect them and he wasn't sure if he dropped them down that they would meet quality assurance. I explained we want what we have paid for and if these means we need to have more coats to protect the wood then so be it. As we have the QA on Monday he is going to check then and get back to me. I also asked if he'd seen the mismatched glass in the bathroom window which he reassured me was no problem, the manufacturers sometimes run out and put in what they have so the windows can be on site in time. It will be changed later.

Some detective work is in order to see if the frames for bi-folds do actually sit flush to the tiles or not so Sandy has driven over to Underwood to take photos, measurements and ask questions with our CSC Greg (a top bloke by the way) who helped us through contract and prebuild. And yes you've guessed it they are totally flush! So if they can do it there we want it on our house - no silly toe stubbing raised bits please.
Does anyone out there have know if it can be done or have bi folds where the tiling or carpet is flush to the frame?

San and Revi - I see you have had your site scrape done. Fantastic.

The other Metricon houses on site will be a soho, a trentham, 2 newhavens and possibly a lindrum next door to us but we don't think it will fit as it is too long. Thanks to Greg for letting us know.

Next: The bricks and gyprock will be delivered tomorrow and the Quality Assessment inspection (QA) will be happening on Monday.

Air Con or Alien

Extractor Vent?