Showing posts with label Laundry. Show all posts
Showing posts with label Laundry. Show all posts

Saturday, September 3, 2011

Its Starting To Look Like Home

So the cladding isn't finished, they are waiting for some more brick capping to come before they can do more but what cladding there is has been painted along with the sofits. There was a solitary painter on site who was kind enough to let us in so we could check on progress.

When Sandy when for the site meeting yesterday the tilers weren't actually given a lot of information as to what goes where and which tile is which (that's worrying!) so she gave them our tile samples showed them which tile was which and also gave them our plans from the Tile Studio which were much more detailed. That way they have no excuses for any potential stuff ups.
The wet areas floors have been tiled (we are having floor to ceiling tiles so there is a lot for them to do)  and thankfully we are happy with the colour choices as the tiles used for the powder room will be the same as we are having for the entry, hallway and family kitchen dining spaces so they are going to taking up a lot of square meterage. They have laid the shower areas in a diamond layout which I'm not that keen on but its really hard for them to get the fall right if they lay the tiles square and you can end up with water pooling in all the wrong places. I'm sure once the shower screens are on and the other tiles are done it'll look fine. The splash backs in the laundry and butler's pantry have also been done, hopefully the butler's pantry gets more tiles than are currently there as two rows looks quite stingey. We went for white in the laundry and a greyish tone in the pantry which looks very smart. In the kitchen the island bench is completed and the upgrade sink is in (nice). In fact I think all the sinks in the bathrooms have also been fitted. ( I had a super fast whiz through the house as the painter was getting ready to go home and I didn't want to hold him up).

The study doors have been hung, they are the same style as the front door but with translucent glass and of course they look fantastic, I should think so too the cost enough!! Initially we are planning to use the study as a playroom for our son so all his mess can stay in there and be hidden away with one swift slide of the door.
Under the stairs the framework has been started for the space to be boarded, the SS told us a few weeks back that they will put a door on here so we can use it as a storage cupboard will have to keep an eye on that to make sure it happens.

I think that's pretty much it for progress thus far, I can't believe how much they have done..... the bill for lock up will come shortly and as they have done so much inside they next stage will be completed almost as soon as we pay for lock up so it's going to be bills, bills for us.
Are we pleased with our build? Yes. Have we been happy with Metricon? Yes. We have no complaints and everything has been handled swiftly and professionally so far. Let's hope we can say the same once the build is complete.
Warning Lots of photos again:

Powder Room - These Tiles Will Continue Throughout Most Of Downstairs

Stud Work Prior To Boarding Under Stairs

The Island Bench

Kitchen Sink

Laundry - Plain White Tiles

Butler's Pantry Splashback - Will It Only Be 2 Tiles High?

Study Door - Fixed and Sliding Panels

Caution!

Ensuite Vanity With Sinks and Extra Holes for Electrical Socket

Ensuite Floor Tiled Note Diamond Pattern In Shower and Cut Outs for Smart Tile Wastes

Looks Like the Cornice Has to Go

Dark Tile (left) For Shower Wall and Brown Tile (Right) for the Rest

Wednesday, August 24, 2011

Lots Of Activity

While we've been away it has rained a lot but the tradies have been busy on site doing lots of little things and completing tasks that were already underway. There were about 8 blokes working away at the house when we went in on Monday. So what progress did we see?

The kitchen installation continues
The cabinets have handles on
Doors have been hung (some not all)
We have door handles and locks on the exterior doors (our son wants his keys now!)
The floor prep has been done for the bathrooms
Laundry sink is in
Holes for lights, switches and other electrics have been made
Architraves are being cut and fit
The brick work is finished
A new kicker has been made for the ensuite vanity
Ensuite vanity has been moved (amusing photo to follow)

The tiling should start soon however the last we heard the tiles are not in the country yet so no guaranteed timeline can be given on that one.
Its looking good and really starting to come together as a house and not just a build now.
Front Door Handle

Rear Garage Door Hardware
Translucent Glass Door to Powder Room

Butler's Pantry Left Kitchen Right With Cavity Slider Middle (No Doors Yet)

Laundry Sink, Laminex Seal Bench Top

Island Bench With Space For Dishwasher

Close Up of Door Handles

Island Bench From Another Angle Note Silver Kicker

Bathroom Floor Prep

The Balcony

More of the Balcony

Cut Out For Light (This One Is Patch) In Wrong Place

Look They've Repositioned The Vanity!!!!!

Tuesday, August 16, 2011

Kitchen Creations

The kitchen is taking shape so is the butler's pantry, laundry, powder room and bathrooms. The cupboards are in, doors are on and the laminate bench top in the laundry has been fitted. Wow this build is on fire. I still haven't been able to see them in real life but from the photos taken earlier today I am impressed. Obviously the Caeserstone bench tops will come later but the cabinet maker says he will be finished in two more days.
It's show day here in Brisbane tomorrow so I will be having time off and will able to have a leisurely stroll around on site and take in all that has happened. Actually we are going away for a few days for a mini holiday and a couple of work seminars so won't be back until Monday. Oh no I'm going to miss things happening!

As a point of interest, the drawings for the kitchen had to be amended to allow space for the 2 big ovens we've had so we have lost 2 pot drawers, no problem we had quite a lot so they won't be missed. However, we have asked if we get a refund on those as we have paid for them and had them priced in 2 pac.
It's with the finance department so should hear back in a few days.

The brick work is almost completed and then it'll be time for cladding. Not sure if they paint it before or after installation. Once that is finished the scaffolding comes down the pool company can come in and make a start on the excavation and pool works. Must order some temporary fencing to go around that. Its so exciting - can't wait to be in a swimming in my new pool in my new garden at my new home.


Squatters - The Cabinets Have Moved In

Blackened Linewood Doors

Upper Story Bricked

Laundry

Laundry Linen Cupboard

Butlers Pantry

Powder Room Vanity