Showing posts with label Eaves. Show all posts
Showing posts with label Eaves. Show all posts

Saturday, September 3, 2011

Its Starting To Look Like Home

So the cladding isn't finished, they are waiting for some more brick capping to come before they can do more but what cladding there is has been painted along with the sofits. There was a solitary painter on site who was kind enough to let us in so we could check on progress.

When Sandy when for the site meeting yesterday the tilers weren't actually given a lot of information as to what goes where and which tile is which (that's worrying!) so she gave them our tile samples showed them which tile was which and also gave them our plans from the Tile Studio which were much more detailed. That way they have no excuses for any potential stuff ups.
The wet areas floors have been tiled (we are having floor to ceiling tiles so there is a lot for them to do)  and thankfully we are happy with the colour choices as the tiles used for the powder room will be the same as we are having for the entry, hallway and family kitchen dining spaces so they are going to taking up a lot of square meterage. They have laid the shower areas in a diamond layout which I'm not that keen on but its really hard for them to get the fall right if they lay the tiles square and you can end up with water pooling in all the wrong places. I'm sure once the shower screens are on and the other tiles are done it'll look fine. The splash backs in the laundry and butler's pantry have also been done, hopefully the butler's pantry gets more tiles than are currently there as two rows looks quite stingey. We went for white in the laundry and a greyish tone in the pantry which looks very smart. In the kitchen the island bench is completed and the upgrade sink is in (nice). In fact I think all the sinks in the bathrooms have also been fitted. ( I had a super fast whiz through the house as the painter was getting ready to go home and I didn't want to hold him up).

The study doors have been hung, they are the same style as the front door but with translucent glass and of course they look fantastic, I should think so too the cost enough!! Initially we are planning to use the study as a playroom for our son so all his mess can stay in there and be hidden away with one swift slide of the door.
Under the stairs the framework has been started for the space to be boarded, the SS told us a few weeks back that they will put a door on here so we can use it as a storage cupboard will have to keep an eye on that to make sure it happens.

I think that's pretty much it for progress thus far, I can't believe how much they have done..... the bill for lock up will come shortly and as they have done so much inside they next stage will be completed almost as soon as we pay for lock up so it's going to be bills, bills for us.
Are we pleased with our build? Yes. Have we been happy with Metricon? Yes. We have no complaints and everything has been handled swiftly and professionally so far. Let's hope we can say the same once the build is complete.
Warning Lots of photos again:

Powder Room - These Tiles Will Continue Throughout Most Of Downstairs

Stud Work Prior To Boarding Under Stairs

The Island Bench

Kitchen Sink

Laundry - Plain White Tiles

Butler's Pantry Splashback - Will It Only Be 2 Tiles High?

Study Door - Fixed and Sliding Panels

Caution!

Ensuite Vanity With Sinks and Extra Holes for Electrical Socket

Ensuite Floor Tiled Note Diamond Pattern In Shower and Cut Outs for Smart Tile Wastes

Looks Like the Cornice Has to Go

Dark Tile (left) For Shower Wall and Brown Tile (Right) for the Rest

Friday, August 26, 2011

Snuck In

Managed to sneak in to the house, I don't think any of the tradies noticed us. Here's some photos of what has been done.
Vanity in the Middle, Now Doesn't That Look Better?

The Sliding Doors to the Ensuite, Mmmm Nice

Eaves

Linen Cupboard with Doors

Skirting Boards

More Eaves

And Some More Eaves Only This Area to Clad (?) Now

Thursday, August 25, 2011

Locked Out

Sandy went on a quick spy mission early morning yesterday to check on progress however she didn't have the camera with her.
But I can report that the exterior cladding for upstairs has been started, along with the sofits (the eaves bit) and the vanity unit is in its rightful spot, taking pride of place in the centre of the ensuite wall. Phew they did it and apparently it looks perfect. The has been some explorations through the boards as they have been searching out the electrics so as to put the socket and light over the vanity in the correct places too. A bit of patchwork to the boarding will be needed so that it looks like nothing ever happened.
The architraves are finished and more of the doors have been hung.
Later in the afternoon we returned with camera at the ready only to find we were locked out! (Did contemplate trying to squeeze through a window but its so muddy on site after the rain that the likelihood of a slip and fall moment was to high so gave it a miss).

So we'll all have to make do with a couple of cladding shots instead.

Rear of House Cladded

Cladding Close Up and Sofits