The painter has been and do the first coat to cover up the touch ups to the damaged plastering as part of the service and maintenance. The plumber is still to come out and hopefully the painter will be back to do the second coat as the walls are quite patchy.
Our electrician has been and put heater lights in both bathrooms which we are really enjoying now that Brisbane is having a mini cold snap. Look in know you guys down south don't think that 1 degree overnight is that cold but for us in is like being in the Antarctic.
Much excitement this week as the cubby house and shed are going to put together and the soil and chook poop is coming for the raised vegetable beds. The garden is almost complete. Scored a great 12v electrical ride on car on EBay for my son so I guess he'll be out driving around or in his cubby from now on - oh the peace and quiet - erm hang on his going to have the coolest play area ever and that means all the kids in the estate are going to want to hang out here too!
The cabinet maker has been out to measure up and quote for some entertainment units and storage and thankfully the price was less than anticipated so there should be just enough left in the budget to get this made up. Oh no that means we have to choose finishes and colours again. It will be worth it and I will most definitely post photos once its all done.
We are getting towards the end of our post build phase so I think this blog will naturally be reaching its conclusion soon, however I must say I have really enjoyed doing my posts and its great to look back at progress. Hard to believe that where there are now houses was bushland and empty fields less than a year ago.
A novice's journey from vacant block to dream home with Metricon Brisbane. We wish to share this exciting project with friends and family along with others building a home. We hope by sharing the detail of our build process that this blog will inspire and support other first time, inexperienced, virgin home builders.
Showing posts with label Cabinets. Show all posts
Showing posts with label Cabinets. Show all posts
Monday, May 28, 2012
Wednesday, August 24, 2011
Lots Of Activity
While we've been away it has rained a lot but the tradies have been busy on site doing lots of little things and completing tasks that were already underway. There were about 8 blokes working away at the house when we went in on Monday. So what progress did we see?
The kitchen installation continues
The cabinets have handles on
Doors have been hung (some not all)
We have door handles and locks on the exterior doors (our son wants his keys now!)
The floor prep has been done for the bathrooms
Laundry sink is in
Holes for lights, switches and other electrics have been made
Architraves are being cut and fit
The brick work is finished
A new kicker has been made for the ensuite vanity
Ensuite vanity has been moved (amusing photo to follow)
The tiling should start soon however the last we heard the tiles are not in the country yet so no guaranteed timeline can be given on that one.
Its looking good and really starting to come together as a house and not just a build now.
The kitchen installation continues
The cabinets have handles on
Doors have been hung (some not all)
We have door handles and locks on the exterior doors (our son wants his keys now!)
The floor prep has been done for the bathrooms
Laundry sink is in
Holes for lights, switches and other electrics have been made
Architraves are being cut and fit
The brick work is finished
A new kicker has been made for the ensuite vanity
Ensuite vanity has been moved (amusing photo to follow)
The tiling should start soon however the last we heard the tiles are not in the country yet so no guaranteed timeline can be given on that one.
Its looking good and really starting to come together as a house and not just a build now.
| Front Door Handle |
| Rear Garage Door Hardware |
| Translucent Glass Door to Powder Room |
| Butler's Pantry Left Kitchen Right With Cavity Slider Middle (No Doors Yet) |
| Laundry Sink, Laminex Seal Bench Top |
| Island Bench With Space For Dishwasher |
| Close Up of Door Handles |
| Island Bench From Another Angle Note Silver Kicker |
| Bathroom Floor Prep |
| The Balcony |
| More of the Balcony |
| Cut Out For Light (This One Is Patch) In Wrong Place |
| Look They've Repositioned The Vanity!!!!! |
Friday, August 19, 2011
Vanity Solution
The vanity position will be rectified but it will cost us more money as they will have to make a new kicker and alter the carcass. It is to be moved over 500mm so it will be centred give or take 5-10mm either side. Our SS said it would be done yesterday because the tilers are starting to prepare the floors today but as I'm away I can't go on site and check it out until Monday so here's hoping its done properly and that they don't make a botch job of it. We have no idea how much it will cost at this stage however we did get a bonus of a $255 refund for the pot drawers that couldn't fit below our different specification ovens. Fingers crossed that will cover the vanity moving costs.
Well done to our SS for sorting it out the vanity as at first he said there wasn't much scope to move it by more than 300mm but I persisted that there had to be a way to rectify the problem. I explained that I didn't want to spend all that time, effort and cash in planning a home the way we wanted to have to compromise on something that would royally pee me off every time I went in my ensuite. He was pretty understanding and didn't mess about coming up with a solution that suits us and the build. He'll have to draw up some paperwork now for both the refund and the additional charge on the vanity - there better not be any admin fees.
So floor prep for the tiles starts today and the holes were being cut for the electrical sockets and lights (hope they move the one in the ensuite over to be in the middle of the vanity!!!). I will be having a very good look around when we get back.
| Please Move 500mm to The Left |
Well done to our SS for sorting it out the vanity as at first he said there wasn't much scope to move it by more than 300mm but I persisted that there had to be a way to rectify the problem. I explained that I didn't want to spend all that time, effort and cash in planning a home the way we wanted to have to compromise on something that would royally pee me off every time I went in my ensuite. He was pretty understanding and didn't mess about coming up with a solution that suits us and the build. He'll have to draw up some paperwork now for both the refund and the additional charge on the vanity - there better not be any admin fees.
So floor prep for the tiles starts today and the holes were being cut for the electrical sockets and lights (hope they move the one in the ensuite over to be in the middle of the vanity!!!). I will be having a very good look around when we get back.
Thursday, August 18, 2011
Vanity Insanity
OK who thinks having your vanity way off centre is a good idea?
Who thinks having your vanity finish 6cm from your shower screen at one end and over a meter from the bath the other is a good idea?
Obviously the drafting department at Metricon do aaahhhhhhhh ahhhh and ahhh again.
Also the cabinet maker/installer also thinks that this looks nice, is practical and works well as he fitted it without questioning whether it was right.
Now let me explain. Had a lovely look around the house yesterday was enjoying showing it to my mom who is down visiting and having mini break with us and getting to appreciate my amazing kitchen and how great all the cabinets are until........I walked in to my ensuite. What the expletive is the vanity doing there?!!! Why isn't it centred between the bath and the shower etc and so on. No it looks like poop its not what I want I'm unhappy I'm calling the SS. Whats on the plans? Drive back to house dig out plans and oh poop and double poop that's how its been drawn. Noooooo how did we miss that!
Quick call to the SS to very calmly and gently explain that it is not what we wanted we had asked for it to be centred in the space, no we didn't have that in writing we assumed it was basic common sense. Duh that's how they are in the display homes. Yes I admitted it was drawn on the plans and we hadn't noticed after all we only checked the cabinet design not where it was going to be positioned. How annoying, how did we miss that!
Take note guys check the drawings over and over and over again put them away and then look at them several more times before agreeing. The problem is they don't give you the elevations until final contract and then you are so busy reading the small print you don't notice the vanity is a Siamese twin with the shower frame.
Anyway SS said he'll go take and look and get back to us. I told him if it wasn't changed I would cry every day and ring him to tell him I'm still not happy. Let's see what happens as so far they've been really good at sorting things out. I figure if they can erase pot draws without breaking into a sweat they can just amend our plans, post date them and move the vanity. Voila everyone is happy.
And now for the good stuff - Happy Birthday To Me 42 Today oh and some kitchen pictures
Who thinks having your vanity finish 6cm from your shower screen at one end and over a meter from the bath the other is a good idea?
Obviously the drafting department at Metricon do aaahhhhhhhh ahhhh and ahhh again.
Also the cabinet maker/installer also thinks that this looks nice, is practical and works well as he fitted it without questioning whether it was right.
Now let me explain. Had a lovely look around the house yesterday was enjoying showing it to my mom who is down visiting and having mini break with us and getting to appreciate my amazing kitchen and how great all the cabinets are until........I walked in to my ensuite. What the expletive is the vanity doing there?!!! Why isn't it centred between the bath and the shower etc and so on. No it looks like poop its not what I want I'm unhappy I'm calling the SS. Whats on the plans? Drive back to house dig out plans and oh poop and double poop that's how its been drawn. Noooooo how did we miss that!
| The Vanity - Note Big Space From Bath (Left) and No Space To Shower (Right Where Black Waterproofing Is) |
Take note guys check the drawings over and over and over again put them away and then look at them several more times before agreeing. The problem is they don't give you the elevations until final contract and then you are so busy reading the small print you don't notice the vanity is a Siamese twin with the shower frame.
Anyway SS said he'll go take and look and get back to us. I told him if it wasn't changed I would cry every day and ring him to tell him I'm still not happy. Let's see what happens as so far they've been really good at sorting things out. I figure if they can erase pot draws without breaking into a sweat they can just amend our plans, post date them and move the vanity. Voila everyone is happy.
And now for the good stuff - Happy Birthday To Me 42 Today oh and some kitchen pictures
| The Island Bench Being Constructed |
| The Kitchen Cabinets |
| And From The Other Side |
Tuesday, August 16, 2011
Kitchen Creations
The kitchen is taking shape so is the butler's pantry, laundry, powder room and bathrooms. The cupboards are in, doors are on and the laminate bench top in the laundry has been fitted. Wow this build is on fire. I still haven't been able to see them in real life but from the photos taken earlier today I am impressed. Obviously the Caeserstone bench tops will come later but the cabinet maker says he will be finished in two more days.
It's show day here in Brisbane tomorrow so I will be having time off and will able to have a leisurely stroll around on site and take in all that has happened. Actually we are going away for a few days for a mini holiday and a couple of work seminars so won't be back until Monday. Oh no I'm going to miss things happening!
As a point of interest, the drawings for the kitchen had to be amended to allow space for the 2 big ovens we've had so we have lost 2 pot drawers, no problem we had quite a lot so they won't be missed. However, we have asked if we get a refund on those as we have paid for them and had them priced in 2 pac.
It's with the finance department so should hear back in a few days.
The brick work is almost completed and then it'll be time for cladding. Not sure if they paint it before or after installation. Once that is finished the scaffolding comes down the pool company can come in and make a start on the excavation and pool works. Must order some temporary fencing to go around that. Its so exciting - can't wait to be in a swimming in my new pool in my new garden at my new home.
It's show day here in Brisbane tomorrow so I will be having time off and will able to have a leisurely stroll around on site and take in all that has happened. Actually we are going away for a few days for a mini holiday and a couple of work seminars so won't be back until Monday. Oh no I'm going to miss things happening!
As a point of interest, the drawings for the kitchen had to be amended to allow space for the 2 big ovens we've had so we have lost 2 pot drawers, no problem we had quite a lot so they won't be missed. However, we have asked if we get a refund on those as we have paid for them and had them priced in 2 pac.
It's with the finance department so should hear back in a few days.
The brick work is almost completed and then it'll be time for cladding. Not sure if they paint it before or after installation. Once that is finished the scaffolding comes down the pool company can come in and make a start on the excavation and pool works. Must order some temporary fencing to go around that. Its so exciting - can't wait to be in a swimming in my new pool in my new garden at my new home.
| Squatters - The Cabinets Have Moved In |
| Blackened Linewood Doors |
| Upper Story Bricked |
| Laundry |
| Laundry Linen Cupboard |
| Butlers Pantry |
| Powder Room Vanity |
Monday, August 15, 2011
Cabinet Fever
The house has been infested!.......with kitchen cabinets and bathroom vanities. As promised they were delivered to site and are now chilling out in the family room. I haven't seen them yet as I was at work and our son wouldn't let Sandy take any photos as he didn't have his camera as well. Sandy is very excited as the cabinet colours have turned out better than expected, personally I think she is relieved as she twisted my arm to go for a finish in the bathrooms that I was slightly unsure of. We went for a relatively new laminate called Brescia in the bathrooms and Blackened Linewood with white for the kitchen.
The carpenters have started doing the mouldings for the window frames, the door jambs and installed some of the doors. Hopefully I'll have some photos of them soon so for now here is a reminder of the cabinet laminates.
The carpenters have started doing the mouldings for the window frames, the door jambs and installed some of the doors. Hopefully I'll have some photos of them soon so for now here is a reminder of the cabinet laminates.

Subscribe to:
Posts (Atom)
