Showing posts with label Studio M. Show all posts
Showing posts with label Studio M. Show all posts

Sunday, May 8, 2011

Colour Schemes

Interior and Exterior Design - The Colour Schemes

Thought it was time to share what colour scheme we have gone for. As you will see it is mainly greys and browns accented with whites and off whites. We have purposely kept it quite simple so we can add splashes of colour after the build is complete with things like feature walls, wallpaper, soft furnishings, artwork etc etc.
  • Carpet sisal circuit (from carpet call at studio M) similar to this one
Range Sisal Colour Ciruit
Laminate for kitchen benches and butler's pantry 
  • 2 Pac laminex polar white for base cupboards along outside wall
  • island bench, appliance tower, over head kitchen cupboards and laundry blackened linewood natural finish (as above picture)

  • bench tops and island waterfalls ice snow caeserstone, this will also be the bench top for powder room, bathroom and ensuite
  • laundry bench top laminex stipple seal
  • powder room, ensuite and bathroom brescia

  • paint colour taubman crystal gazing (off white)

  • glass splashback Bristol Mortar 
 
  • glass wardrobe taubmans abstract metallic

  • timber stairs and door frames walnut
  • exposed aggregate driveway bushfire


  • exterior metropolis stone bricks, charcoal linea roof tiles, monument gutters and facia, dune downpipes and garage, dune water tank and cladding, silver window frames (had orginally decided on black but then felt they would look too dark against the off white walls from inside the house).
Exterior

External Colour Scheme


Pictures from our trip to studio M showing tiles, laminates, handles, paint colours for walls, splash backs and glass wardrobe.

The Interior Colour Scheme


Kitchen


Tiles
The pale tiles are for the floors, white for the laundry splashback, the browns for the walls in ensuite, bathroom and powder room with a similar one for balcony area, the dark grey is the feature wall in the showers.


Kitchen handles red label upgrade additional $12 each (sorry about the flash glare)
 
Yellow Label handle for laundry and bathrooms (standard range)


Bathrooms

Tile samples

Our Tiles

Wednesday, April 27, 2011

Variations - What We Spent at Studio M

Budget, what budget?
It's hard to know how much all those lovely upgrades and finishes on display at Studio M will cost. You go on Saturdays and spend hours going around saying oh that looks good, I'd like to have that, is that an upgrade or standard and most important of all how much extra will it cost. Now the ladies at Studio M are very helpful and knowledgeable but no one seems to be able to give you a price, not even a rough idea so you are pretty much in the dark on selection day and even then they can only estimate what the final price is. It is not until your post contract variations are generated that you get the final tally.
We have decided to list some of our variation costs to prevent those of you in the planning stage from having heart failure when you are doing your selections.
  • rebate slab edge to recess bi-fold door frames   $240
  • off white colour mortar for brickwork   $2400
  • grey tinted glass to front elevation   $325
  • deadbolt lock for rear garage door   $95
  • upgrade front door handle add   $145
  • pedestal vanity with ceramic tile kicker add   $66
  • chrome pop up wastes to vanity basins   $50
  • chrome waste for bath   $35
  • towel rails   $70 
  • toilet roll holder   $50
  • towel ring   $55
  • 2 Pac gloss for part kitchen   $2015
  • upgrade handles for drawers and cupboards   $324
  • metal kickboard   $270
  • duct rangehood externally   $380
  • 2 Pac for butlers pantry   $1100
  • upgrade handles   $72
  • upgrade to wide architrave   $594
  • external paint colour for cladding   $165
  • upgrade hot water system to 360L***   $825
*** Hot Water System Comment
Look closely at your house plans, they show you have a gas hot water system included in your build. However, what it doesn't tell you is that is is a tiny tiny tiny system (18L) that would only provide enough hot water for a house with one bathroom. So if you are building a bigger home this system is woefully inadequate and unless you want to be running out of hot water all the time you have to upgrade to a larger system. Now you would think that Metricon would be aware of this and would provide a suitablly sized hot water unit in your base price and it would then be your choice if you wanted a much bigger system or one that uses solar or a heat pump etc. But no you don't find this out until the colour selection appointment and then have to choose from the upgrade options adding yet another unexpected additional cost. Hmmm.

I hope that you potential home builders find this useful as you go through your planning stage as it is so easy to get swept away by the lovely displays and finishes on offer and then before you know it you've spent so much more than your budget can stretch to.
We found that some of the standard finishes were excellent whilst others were very cheap and plasticy or just didn't look that nice. It pays to go to Studio M as often as you can before your selection appointments that way you can ask lots of questions, take your time and be prepared. But even then Metricon will find a way to surprise you with the unexpected (like the hot water system).

Monday, April 4, 2011

Electrical Appointment

We did all our selection appointments in one day so by the time our 3pm consultation with Stratus came around we were starting to dip in energy as we had been hard at it since 8.30am. This was the appointment we were most nervous about as we had read many blogs where people had had such a terrible experiences doing their electricals, from unhelpful consultants to big budget blow outs.
Before our visit we had spent hours deciding where lights, power points, switches etc should go and drawing them on to our house plans. I found the best way to do it was to imagine myself going in and out or rooms and where I would need or like a switch or lights, phone points and so on to be.
Luckily for us our consultant was superb, he really knew his stuff and approached our project like it was his own home. He gave us great advice, took time to explain things, go through the options and even made some good suggestions. He was impressed with our drawings as it made his job much easier and also allowed us to understand why certain things would or wouldn't work.

We ended up with almost 70 down lights along with a few fluorescents and vanity lights, a batten point for a stairwell pendant, stair lights, spotlights for outside, outdoor feature lights, circuits for future garden lights, ceiling fans in outdoor room plus security system and home network and of course all the relevant power points and switches.

All in all we spent just over $16k which was right on the budget we had set. Our consultant said we'd done well as most people spend around $20k on a house the size of the Nolan 45.
This appointment took nearly 2 hours and we were very tired at the end of it but so pleased it went well, mainly because our consultant made it so easy and because we had done loads of preparation which seems to be the key.

We also met with our CSC who is about to go on maternity leave, she informed us Council were only waiting for the hydraulics plan so hopefully we will get the go ahead to start building soon.
I am relieved and excited that all the planning and decision making is over and can't wait for the build to finally start!

Sunday, April 3, 2011

Colour Selections at Studio M

So following straight on from tiles we headed over to Studio M for a 3 hour colour selections appointment. Again the sales consultant had all the paperwork prepared in advance and was organised, helpful and very efficient.

Started with bricks and roof which was no problem as we already had them chosen and included in our final contract. Austral metropolis stone for bricks and Linea charcoal roof tiles. Decided to go with off white mortar which is an upgrade of $2000. (Have not had the final price variation yet so everything at this stage is an estimate).
Standard gutters in monument and down pipes in colourbond dune. Rain tank also dune. Standard wide board cladding in you've guessed it ... dune. Panel board garage as standard yes its going to be dune. Outside done.
Bi fold door runners recessed into floor so you don't stub your toes or trip $280 each.
Grey tint to all windows front elevation $25/sqm. There is around 15sqm glass so works out to $375.
Getting a price for concrete and driveway so we can compare. I think we looked at Bushfire? for the colour.
Then we moved on to doors - walnut stain on all wood doors and stairs.
Handles as per promo but upgraded front door handled to the 750mm as the standard one was pretty small. Guessing an extra $350.
Deadlock for rear garage door $90.
Taps, basins, shower, toilet all as promo.
Kitchen 2 pac on part approx $3500-4000
Kitchen sink was wrong one in contract so I guess that will also be more money - we only knew this because the consultants confirm your choices by showing you pictures from the catalogues which we thought was excellent as that way you get exactly what you wanted.

We had already decided on all our laminates and caesarstone so that too was easy.
Timber stairs changed from cantilever to just timber saving around $3000
Carpet upgrade to silver range with best underlay an extra $20/sqm totalling $3220 went for a sisal effect in a mid brown tone called circuit.
Not much to go now....
Glass colour for robe in master bedroom and an off white paint colour through out. Yeah we made it!!

Another drink voucher and 30 mins for lunch later the paperwork is ready to sign off.
Oh but by the way the hot water heater that is included as standard is only good enough for one bathroom so you need to upgrade to a bigger system hmm I wonder how much that will be. Surely if they are doing plans for such a big house a suitable hot water system should be included in the base price?! I think she said it would be another $700 to have the storage heater that we opted for.

Guessing we have spent around $8500 in Studio M.

We were hoping to only spend an extra $15,000 in total for tiles, colours and electricals. Given that we have spent at least $9000 so far that would leave us around $6k for lights along with the $10K allowance we have included in the contract ($16K budget for electrics). Its going to be really tight as looking at our rough plans for lighting, sockets, and switches we both think we'll need more than that especially as we want a security system and possibly home network as well.

I will do another post with all the colour choices etc soon once I have paperwork and pictures seeing as we are mid house move so it is a little hectic right now and I'm not even sure which box they'd be in!!

Saturday, April 2, 2011

Tile Selections

Our tile appointment went really smoothly, we had made all our choices in 40 minutes. We picked all our tiles from the standard range included in our promotional package creating our look with shades of grey and brown throughout.
The consultant was very helpful and had all our plans marked and highlighted in different colours so we could see which was kitchen, floor, bathroom etc. After showing her a few photos on the laptop she knew exactly what we had in mind and was able to offer suggestions.
Colour Scheme for Bathrooms

The only things we upgraded was the edging strips to chrome (12 in total) and the grout as the standard colour is not that pretty.
As it was going to take an hour to do up paperwork we were given a tea/coffee voucher for the local cafe while we waited.

Once all paperwork was completed and signed we were given a copy and samples of the tiles we had selected.

Total spend approx $650

Friday, April 1, 2011

A Day Out Making Selections

What a huge day, our minds are fried from all the decision making and high level concentration required to do tile and colour selections plus electrical plans all in one day. We set off at 6.30am to be in Robina in plenty of time for our 8.30am start so Sandy and I could chat and finalise details over a cup of tea before getting started. Contracts, plans, samples, photos, magazines, sketches and laptop in hand we had come prepared, we wanted today to go as smoothly as possible. After a lovely pot of peppermint tea at the local cafe and a few side bets on how much of our budget we were likely to spend we were ready for 7 hours of planning appointments.

Thankfully all went brilliantly even our electrical appointment. The team at Metricon were very professional, easy to work with and extremely well briefed. They had checked through our plans and contract prior to our arrival and had everything prepared for each appointment, filling us with confidence that they knew what they were doing and what we would need.

A very tiring day as we didn't get home until 6pm so I will post more tomorrow once I have had chance to process everything and have a look at how much we have spent.
Oh and a big thanks to my Mom for coming over to take our boy out for the day would never have been able to do our selections with a 4 year old in tow!

Friday, March 18, 2011

Finding Out The Price of Things

Greetings from Hoi An Vietnam, we are having a fantastic holiday but felt to share this gem of information.

We have a rough plan for our electicals and started to panic about costs once the number of downlights went over 70 having heard they were $100 each! Quick bit of maths tells me that's $7000 just on lights......Noooo!!! That can't be right.

So plan b quickly start to cross things out or go for what would seem to be a cheaper option. Not happy with having to compromise on our dream house Sandy made a really brilliant observation....How can we do a budget when we have no clear idea of how much everything costs, would it not be easier to just ask Metricon in advance? Genius!!! Just shoot off a quick e-mail to the CSC asking how much for lights, power points etc etc.
Got a lovley email back with the following prices:

External double power points $152 each
Outdoor lights (not flood lights) $134-$170 each (up and down light, depending on the finish, etc)
Ceiling fans $275 each (white, 4 blade, 52 inch)
Cfl downlights $105 each (full price, does not include credit for batten holder of $63)
TV point $80 each
Telephone point $95 each
Satellite/ Foxtel point? $160 each (satellite)
2 way light switch $54 each
3 way light switch $79 each

Internal double power point $63

Now doesn't that make things so much easier? So the moral of the story is if there is anything you need to know just ask Metricon.
Now we can go back to our plans with a much better idea of what we are spending.

That's all for now as we are heading off on a boat trip this morning and there is so much wonderful food I am yet to sample here in beautiful Vietnam.

Tuesday, March 8, 2011

Studio M Selections Booked

The CSC called today to inform us that we can do our tile and colour selections in the morning on the 1st April and the electrical appointment the same day in the afternoon. Wow now it's getting super exciting, she even thinks that it shouldn't take too long for the building approval to go through! We have been allocated 2hr 30mins for tiles, 3hrs for colour selections at Studio M and 2 hrs for electricals. Sounds like we are going to have a big day.

Now we'll get to see if all our careful planning and preparation pays off, we are even taking the house plans and the laptop on holiday so we can go through the electrical design again! Now that's dedication. I wonder if we can come in on budget? Allocated $10K in contract price for lights, power points, etc, etc,etc but it sounds like we may need to spend more than that.

Hmm what shall we have?


Really hoping we get some good consultants who will be able to offer suggestions, ideas and assistance when needed to help us achieve the finishes and look that we are after. Lots of decisions to make and we certainly don't want to get it wrong.
I've heard some shocking stories about the electrical appointments (pun intended!) so let's hope it doesn't turn in to some big April fools joke!!

Tuesday, January 4, 2011

Studio M

Back to work after a lovely relaxing break.
Got e-mail from CSC today with address of Studio M, Tile Studio and electrical. Even provided a little map to make it easier for us to find. Everything is in Robina which is on the Gold Coast and will take us about an hour to get there but hey we can always make a day of it and go to the beach afterwards, if it ever stops raining! The beach would not a bad idea with a 4 yr old in tow as he'll be a bit tired after the drive and going round a showroom. Luckily for us he loves looking at house plans and choosing colours especially if he can take samples home with him so hopefully we can keep him engaged long enough to start getting a feel of what's on offer.

Studio M have samples, colours, doors and door handles, kitchen and bathroom ideas, taps, tiles and much more for you to put your mark and style into your home. They are open Saturday 9.30 - 3.00 so you can have a browse, start gathering ideas and see what options are available.This will be worth a visit as we haven't really given this much detailed thought and believe you can never be over prepared. Nothing worse than turning up to the colour selection appointments without an clue then ending up making pressured decisions which you may live to regret. (Think we'll get Nana to look after the boy when we have our selection appointments).



Websites Studio M and Tile Studio