Late afternoon yesterday we had a quick drive by of the house to survey what has been done. For us it's no longer the block as so much has been completed and it's beginning to feel like our home. We were locked out so had to make do with looking through the windows, try it it gives you a whole new perspective of your build...... like isn't our family room/kitchen/dining area enormous! And wow those doors look incredible etc etc.
Anyway.....The cladding is finished and the painter has only the front section on the balcony left to paint. The paint colour is dune to match the garage door and goes beautifully (or so we think) against the bricks and the roof tiles. But when are the bricks getting cleaned and the scaffolding coming down? [We want to get construction on the pool commenced and can't until the scaffolding has been moved].
Inside more doors have been stained and hung and the wet area tiles have been grouted. Which means that is must be time to start painting the interior. My understanding is that painting will take approximately 6 weeks to complete. I think I may have that totally wrong and it may mean that there or around 6 weeks or so until the house is complete hmm I think the SS said that once painting starts its only 6 or 7 weeks until the finish date. Do I sound confused? Moving along....
So it's painting next and afterwards comes the floor tiles, carpets, lights etc etc. Followed by practical completion inspection (PCI) and then handover. We are psychologically preparing ourselves to be moving house in November.
Will have to delay posting photos as they weren't very good through the dust and dirty glass.
A novice's journey from vacant block to dream home with Metricon Brisbane. We wish to share this exciting project with friends and family along with others building a home. We hope by sharing the detail of our build process that this blog will inspire and support other first time, inexperienced, virgin home builders.
Showing posts with label Cladding. Show all posts
Showing posts with label Cladding. Show all posts
Thursday, September 8, 2011
Thursday, September 1, 2011
Bench Tops, Tiles and Photos
The cladding work has been at a stand still, don't know where they are or why they aren't on our job they packed up and left lunch time Friday and haven't been seen since. Positive - not at lock up stage until the cladding is done so the money gets to stay in the bank longer. Negative - the scaffolding stays up longer and excavation work for the pool gets delayed again. I know it will get done eventually but I find it difficult to comprehend why they start something and don't finish it when it only looks like there is a days work left to get it completed. I know they get scheduled to do other jobs and can't be in two places at once but still....hang on oh let me do a double take what's that up on the scaffolding......could it be...yes it is it's the cladding team.
And well pardon me for thinking nothing had been happening on site. Inside is a very different story... the chippie has finished all the skirting and architraves and put shelves in the wardrobes, linen cupboard and butler's pantry. The floors have been cleaned (to a degree anyway), the floor and wall tiles have been delivered and are now taking up most of the garage and the team from a marble and granite company were there installing the Cesarstone bench tops. They were in the middle of doing the island bench for the kitchen when we arrived but had already finished the bench tops for the bathroom vanities and the rest of the kitchen.
Yummy they look beautiful and very luxurious. We went for a colour called ice snow which as the name suggests is mainly white, but it has small off white to grey flecks in it which goes really well with the cupboard colours and hopefully the tiles we picked from the standard range. As the bench tops were part of the promo package we only had 5 colours to choose from but luckily we really liked this one.
The tilers have started the wet areas today, the rest of the flooring will not be done until after painting which will be starting in a bout a week. The doors for the study have been delivered and installed, we went for a fixed glass panel and a big slider with translucent glass, really smiko (no photos yet sorry). And our SS said we can keep the bricks, we just need to put a note on them saying "leave for owner" and move them out the way. Hmm that's going to be fun just the two of us and a wheel barrow through the mud.
Update:- yes you wont believe your eyes but our house should be finished in about 9 yes 9 that's nine count them 1 2 3 4 5 6 7 8 9 weeks!!!!!! No way 9 weeks plus 13 weeks (already gone) makes 24 weeks wow that is one speedy build. Better start repacking our things... We were given that information straight from the horses mouth the construction manager (CM) was on site and that was what he told us.
By the way we asked him if he knew why the builds in Vic and NSW take so long and he told us that the CMs from up here had gone down to find out why and to try and rectify the situation so that things can be sorted out. I know that doesn't help you guys who have had 40+ week builds but it looks like Metricon realise that there is a huge problem down south and have sent the Queensland boys to show them how its done. Might make a difference to those of you just starting out, it will be interesting to see if things improve.
Photo time:
And well pardon me for thinking nothing had been happening on site. Inside is a very different story... the chippie has finished all the skirting and architraves and put shelves in the wardrobes, linen cupboard and butler's pantry. The floors have been cleaned (to a degree anyway), the floor and wall tiles have been delivered and are now taking up most of the garage and the team from a marble and granite company were there installing the Cesarstone bench tops. They were in the middle of doing the island bench for the kitchen when we arrived but had already finished the bench tops for the bathroom vanities and the rest of the kitchen.
Yummy they look beautiful and very luxurious. We went for a colour called ice snow which as the name suggests is mainly white, but it has small off white to grey flecks in it which goes really well with the cupboard colours and hopefully the tiles we picked from the standard range. As the bench tops were part of the promo package we only had 5 colours to choose from but luckily we really liked this one.
The tilers have started the wet areas today, the rest of the flooring will not be done until after painting which will be starting in a bout a week. The doors for the study have been delivered and installed, we went for a fixed glass panel and a big slider with translucent glass, really smiko (no photos yet sorry). And our SS said we can keep the bricks, we just need to put a note on them saying "leave for owner" and move them out the way. Hmm that's going to be fun just the two of us and a wheel barrow through the mud.
Update:- yes you wont believe your eyes but our house should be finished in about 9 yes 9 that's nine count them 1 2 3 4 5 6 7 8 9 weeks!!!!!! No way 9 weeks plus 13 weeks (already gone) makes 24 weeks wow that is one speedy build. Better start repacking our things... We were given that information straight from the horses mouth the construction manager (CM) was on site and that was what he told us.
By the way we asked him if he knew why the builds in Vic and NSW take so long and he told us that the CMs from up here had gone down to find out why and to try and rectify the situation so that things can be sorted out. I know that doesn't help you guys who have had 40+ week builds but it looks like Metricon realise that there is a huge problem down south and have sent the Queensland boys to show them how its done. Might make a difference to those of you just starting out, it will be interesting to see if things improve.
Photo time:
| Cladding In Progress |
| Gas Lift Cabinet |
| Miles of Tiles |
| Butler's Pantry Bench Top and Sink |
| Shelving in Butler's Pantry |
| Yummy Kitchen Bench Top |
| Vanity With Caeserstone |
| Sinks |
| Manhole and Architraves |
| Cladding and Flashing Over Garage |
| Hollywood Robe Master Bedroom (we don't have this many clothes!!!) |
| Capping on Balcony |
| Linen Cupboard Shelves |
| Island Bench Awaiting Waterfall Edges |
Sunday, August 28, 2011
Rain Rain and Mud
It's been raining almost non stop, the site is a mud pit and work had to finish early on Friday as the cladding crew didn't fancy getting wet. The forecast for next week is mixed it may be sunny or it might rain who knows? We really want another dry spell so they can finish the cladding and get it painted. They have started the front area over the garage and have half finished cladding over the beams in the outdoor room. Once they are done and painted then the scaffolding will come down and the pool can be excavated, we were originally planning to have been digging early August now it will be mid September which isn't a drama. However, the people who were going to take our excess soil don't want it now so we will have to advertise and make more arrangements which is a bit of a pain.
I think from my sneaky look through the other day that all the cabinets in the kitchen and bathrooms are installed now and just waiting for their bench tops. Not really sure what is next on the agenda but Tom our SS thinks the tiles should be in the country tomorrow and then on site a couple of days after. Well the tilers are going to have a lot of cleaning up to do before they start as you can't see the floor for dust, saw dust, bits of wood, left over gyprock and empty packets. (Yes I can't stand the mess, Sandy wanted to go and sweep up yesterday but thankfully we are locked out so had a lazy TV day instead!).
It's odd isn't it but the more that gets put in the house the bigger it seems?! I think we will just all huddle together in one room to start with as that is what we are used to doing in the apartment. I think we'll need a map and GPS to start with once we move in. But oh boy it's going to be awesome for hide and seek!
Have been looking at wallpaper for a feature wall in our boy's room thought this would be cool....
I think from my sneaky look through the other day that all the cabinets in the kitchen and bathrooms are installed now and just waiting for their bench tops. Not really sure what is next on the agenda but Tom our SS thinks the tiles should be in the country tomorrow and then on site a couple of days after. Well the tilers are going to have a lot of cleaning up to do before they start as you can't see the floor for dust, saw dust, bits of wood, left over gyprock and empty packets. (Yes I can't stand the mess, Sandy wanted to go and sweep up yesterday but thankfully we are locked out so had a lazy TV day instead!).
It's odd isn't it but the more that gets put in the house the bigger it seems?! I think we will just all huddle together in one room to start with as that is what we are used to doing in the apartment. I think we'll need a map and GPS to start with once we move in. But oh boy it's going to be awesome for hide and seek!
Have been looking at wallpaper for a feature wall in our boy's room thought this would be cool....
![]() |
| Map Wallpaper |
Thursday, August 25, 2011
Locked Out
Sandy went on a quick spy mission early morning yesterday to check on progress however she didn't have the camera with her.
But I can report that the exterior cladding for upstairs has been started, along with the sofits (the eaves bit) and the vanity unit is in its rightful spot, taking pride of place in the centre of the ensuite wall. Phew they did it and apparently it looks perfect. The has been some explorations through the boards as they have been searching out the electrics so as to put the socket and light over the vanity in the correct places too. A bit of patchwork to the boarding will be needed so that it looks like nothing ever happened.
The architraves are finished and more of the doors have been hung.
Later in the afternoon we returned with camera at the ready only to find we were locked out! (Did contemplate trying to squeeze through a window but its so muddy on site after the rain that the likelihood of a slip and fall moment was to high so gave it a miss).
So we'll all have to make do with a couple of cladding shots instead.
But I can report that the exterior cladding for upstairs has been started, along with the sofits (the eaves bit) and the vanity unit is in its rightful spot, taking pride of place in the centre of the ensuite wall. Phew they did it and apparently it looks perfect. The has been some explorations through the boards as they have been searching out the electrics so as to put the socket and light over the vanity in the correct places too. A bit of patchwork to the boarding will be needed so that it looks like nothing ever happened.
The architraves are finished and more of the doors have been hung.
Later in the afternoon we returned with camera at the ready only to find we were locked out! (Did contemplate trying to squeeze through a window but its so muddy on site after the rain that the likelihood of a slip and fall moment was to high so gave it a miss).
So we'll all have to make do with a couple of cladding shots instead.
| Rear of House Cladded |
| Cladding Close Up and Sofits |
Saturday, August 13, 2011
Glorious Garage Door
Well it is official we are supremely happy with our choice of panel lift garage door and the colour as now we have seen it in real life we personally think the dune works great with the bricks. Phew and double phew as we are having the cladding painted to match and the downpipes and the water tank so it would be disastrous if we decided we hated it.
The cladding boards have been delivered and are currently lying down on the driveway covered in black plastic.
Here are some happy snaps.
The cladding boards have been delivered and are currently lying down on the driveway covered in black plastic.
Here are some happy snaps.
| Garage Door - Colorbond Dune |
| Close Up |
| Inside |
| Cladding Delivered |
| Cladding Boards |